7 bidders for package of Delhi-Dehradun Expressway Phase 2

Loading...
Loading...



Loading...

7 construction firms have covered 210 km. Bids have been submitted for the construction of 27 km Package 1 of Delhi-Saharanpur-Dehradun Expressway119 km Phase 2 connecting EPE – Saharanpur.

This 6-lane greenfield expressway will be developed in 4 phases. Its phase 2 of 119 km lies within Uttar Pradesh and connects the Eastern Peripheral Expressway near Baghpat with Latifpur village on the Saharanpur bypass via 4 civic packages of 25.5 to 37 km.

Loading...

NHAI had originally invited bids for the same in January with a construction deadline of 2 years. Krishna Constructions was the lowest bidder in June, but a contract was never awarded for unknown reasons, despite Krishna’s bid being significantly lower at Rs. 580.00 crore vs NHAI estimate of Rs. 728.90 crore

Technical bids were opened on 23rd November.

Loading...

bidders,

  • DP Jain & Company Infrastructure Pvt. Ltd.
  • KRC Infraprojects
  • Krishna Nakshatra Pvt. Ltd.
  • PNC Infratech Limited
  • Raj Shyama Construction Pvt. Ltd.
  • Ravi Infrabuild Projects Pvt. Ltd.
  • Sam India Builtwell Private Limited

scope: Development of Six Lane Access Control Greenfield Highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Project EPC Mode (Package-I) in the state of UP on 2nd EPE Design from Junction of Ch 0.000 to Design Ch 27.000 (Gram-Lohada). Call

Loading...
Kolkata Metro
Route of Delhi-Dehradun Expressway through promo video of NHAI- View project information

Some useful links of this package shared by follower Kanishk: alignment , KML alignment file (Check it out on Google Earth); linear plan And junctions (pages 12-15)

The bids have now been sent for technical bid evaluation which may take a few months to complete. When this is done, the financial bids of the technically qualified bidders will be opened to determine who is the lowest bidder and most likely contractor for this package.

Loading...

List of all packages on this expressway and details with their status can be seen here,

For more updates, see expressway section or mine home page,

Loading...

– TMRG

Loading...



Loading...
Share

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *