Indian Railways to develop 503km Bengaluru-Hyderabad Semi High Speed ​​Rail Corridor

Loading...
Loading...


Indian Railways to develop 503km Bengaluru-Hyderabad Semi High Speed ​​Rail Corridor

Loading...

Bengaluru, India (Urban Transport News): To reduce travel times in two IT hubs of the southern part of the country, Indian Railways is planning to build a semi-high-speed railway track between Bengaluru and Hyderabad at an estimated cost of Rs 30,000 crores. The total distance of the proposed semi-high speed rail track would be about 503-km and it will reduce the travel time to two-and-a-half hours.

According to reports, the railway track is compatible for running trains at a speed of 200km per hour and the traveling time between two cities can soon be reduced to two-and-a-half hours. The propsed semi high-speed railway track will be between Yelahanka Station in Bengaluru to Secunderabad Station in Hyderabad covering a distance of 503km. The project, to be built as part of the PM-Gati Shakti initiative, would reportedly cost around Rs30,000 crore.

Loading...

Sources said that a route has already been proposed for the construction of this railway track which will avoid the detours in between two major cities. A fencing wall of 1.5m height will also be built on both sides of this semi-high speed railway track which will help the train to operate at the proposed speed without any hurdles.

At present, it takes around 10 to 11 hours for passengers to commute between Hyderabad and Bengaluru by train with the current infrastructure and after launching semi-high speed train between both cities, the travel time will be reduced to 150 minutes.

Loading...

Project at a glance

    Loading...
  • Project Name: Bengaluru-Hyderabad Semi High Speed ​​Rail Corridor
  • Terminal Stations: Yelahanka (Bengaluru) – Secunderabad (Hyderabad)
  • Loading...
  • Total length of corridor: 503-km
  • Speed ​​of Trains: Upto 200 kmph
  • Loading...
  • Estimated Project Cost: Rs 30,000
  • Estimated Travel Time: 2 hours 30 minutes

Once the plan gets approved by Ministry of Railways and concerned Authorities, Indian Railways will start finding the consultants to conduct feasibility study, traffic survey and prepare the detailed project report. The new-generation Vande Bharat Express Trains can be deployed on this route.

Loading...

Loading...
Share

You may also like...

Leave a Reply

Your email address will not be published.